Pump Commissioning Checklist With OEM Specifications for Start-Ups

Check all piping for stress on equipment.
Identify all control switches to equipment with lockout procedures.
Check that all drive couplings are disconnected from drivers.
Pre-run all electric motors for one hour.
Check all oil levels and identify that proper oil and lubricant are used.
Check that adequate couplings are used for appropriate horsepower.
Check that the equipment is secure to its bases.
Proceed with cold alignment.
Run equipment as per OEM procedure.
Check all piping and connections for leaks.
Complete hot alignment.
Sign equipment over to production staff complete with commissioning report, including digital data reports from laser alignment specifications.
Teach all operators start-up procedures as per OEM procedures.

Chemical Compatibility Information

Click below to download and print information:

Forms

Click on the forms listed below to download and print:

Adobe

Please Note:

The downloaded forms and information listed above require you to have Adobe Reader installed on your computer.

 

Click the icon for a free download of the Adobe Reader software. 

Have a Query?

Our team’s here to answer your questions.

bottom of page